Formhavn

Template index

Every section, in one place

The complete block library of the template: one name per section, one stylesheet per block, one optional script. Every entry links to the same block rendered live below the catalogue.

Section catalog

Structure and navigation

Marketing sections

Work and projects

Commercial sections

Editorial sections

  • 01

    Posts

    .posts

    section-posts.css · shared/filter.js

    See it below
  • 02

    Article

    .article

    section-article.css · section-article.js

    See it below
  • 03

    Comments

    .comments

    section-comments.css

    See it in place
  • 04

    Search

    .search

    section-search.css · section-search.js

    See it below
  • 05

    Results

    .results

    section-results.css · section-search.js

    See it below

Shared primitives

01 Hero .hero Catalogue
Abstract study of a studio building with an arched entrance and offset volumes

Architecture studio · Copenhagen

Buildings shaped by light, material and restraint.

We design housing, cultural buildings and civic spaces that cost less to run, age with grace and belong to the street they stand on.

Fourteen architects and engineers, one studio in Islands Brygge.

02 Logos .logos Catalogue

Selected clients and collaborators

Six of the institutions we have built for since 2008.

03 Services .services Catalogue

What we do

Six disciplines, one model

Architecture, interiors, planning and engineering sit in the same room. Nothing is thrown over a wall, and nothing is priced twice.

  • Daylight and comfort

    Every room is tested in simulation before a wall is drawn, so the plan still works on the darkest week of December.

  • Material research

    Samples, mock-ups and life-cycle costing decide the palette long before anything is specified.

  • Planning and consent

    Local plan negotiations, heritage statements and neighbour consultation handled by the studio itself.

  • Low-carbon delivery

    An embodied carbon budget is set at concept stage and tracked against the bill of quantities to handover.

  • Site supervision

    Weekly visits, photographed and minuted, so the drawing and the building remain the same thing.

  • Interior detailing

    Joinery, lighting and services coordinated to the millimetre inside one federated model.

04 Split .split Catalogue
Abstract floor plan showing four rooms arranged around a courtyard

The approach

One drawing, tested until it is quiet

Most buildings fail not in their details but in their first decision: where the rooms sit and where the light enters. We spend longer than is comfortable on that decision, and it saves the client money every month afterwards.

Our plans are developed in section as much as in plan. If a room cannot be understood in one drawing, it is not finished.

  • Massing options priced before a single detail is drawn
  • Daylight and overheating modelled for the worst week, not the best
  • Material choices backed by samples and a life-cycle cost
  • One project architect from first sketch to final handover
05 Stats .stats Catalogue

The studio in numbers

Eighteen years of built work

  • 64 Built projects
  • 18 Years in practice
  • 4.2 Tonnes CO₂e saved per home
  • 96% Work from repeat clients
06 Process .process Catalogue

How a project runs

Four stages, no surprises

Each stage ends with a fixed deliverable and a fixed fee, agreed before the next stage begins.

  1. 01 — Listen

    Brief and site

    Two workshops, a site visit and a written brief you sign off. Budget and constraints are stated in numbers, not adjectives.

  2. 02 — Test

    Options and evidence

    Three massing studies with daylight, cost and carbon figures side by side. One is chosen and developed.

  3. 03 — Detail

    Consent and tender

    Planning package, specifications and tender documents. Contractors price the same scope, so the numbers compare.

  4. 04 — Deliver

    Site to handover

    Weekly supervision, monthly cost reports, snagging and a building manual at handover.

07 Project hero .project-hero Catalogue
Abstract elevation of a library with a deep arched entrance and a circle above

Selected work · 2024

A library, a hall and a courtyard for 4,200 residents. The brief asked for a building that would work in January; the answer was a deep arched entrance, a reading room with two orientations and a courtyard that traps the low winter sun.

Location
Nordhavn, Copenhagen
Completed
2024
Programme
Library and community hall
Area
2,850 m²
Read the project
08 Testimonials .testimonials Catalogue

Clients

What it is like to build with us

  • They cut eleven square metres from the scheme and made the flat feel larger. That is the whole job, and almost nobody does it.
    Maren Kolstad Client, Havnegade housing
  • The cost report in stage two was within four percent of the final account two years later. Our board stopped asking for updates.
    Henrik Aas Director, Byens Fond
  • We asked for a library that would work in winter. They gave us a reading room that works in winter and a courtyard that works in June.
    Ilse Bakker Head of culture, Nordhavn
  • The weekly site notes were the most useful documents of the whole build. We always knew what had changed and what it cost.
    Jonas Vestergaard Project manager, Nordhavn
  • They said no to two ideas we had already fallen in love with, and they were right both times. That is worth paying for.
    Amina Toure Client, Vesterbro school
09 Projects .projects Catalogue
10 Project info .project-info Catalogue

The story

A library that works in January

The site sits behind a row of harbour warehouses, north-facing to the street and open to the water at the back. The obvious plan — a glass frontage to the quay — would have given the library a beautiful photograph and a reading room with no direct sun for four months of the year.

We turned the building around. The entrance is a deep arch cut into the warehouse line, and the reading room runs east to west along the courtyard, so it receives light from two directions from February to November. The courtyard itself is sheltered by the L-shaped plan and holds the low winter sun for most of the afternoon.

What the plan had to solve

The brief asked for three things that usually fight each other: silence, supervision and a place for teenagers to be loud. The answer was a section, not a floor plan. The quiet reading room sits above the hall, separated by a concrete slab and a two-metre buffer of circulation; the teenagers got the courtyard and a covered edge they can occupy without being asked to move on.

The timber frame was chosen for its carbon budget, then kept exposed because it also solved the acoustics. Nothing in the building is decorative. The ceilings are the structure, the walls are the fire strategy and the benches are the ventilation duct covers.

What we would do again

Spending the first three weeks on the section. It cost the client nothing and it decided the building. The only change we would make is the courtyard paving, which is too smooth in rain and will be replaced with a rougher stone when the first maintenance cycle comes around.

12 Timeline .timeline Catalogue

Milestones

Five moments that changed the studio

The buildings matter, but so do the decisions that made them possible. These are the five we still talk about.

  1. 2008

    Two architects, one borrowed room

    Founded by Ingrid Halvorsen and Tomas Reis with a single commission and a second-hand plotter.

  2. 2012

    First housing scheme completed

    Twenty-four flats in Nørrebro, built to a fixed price and handed over three weeks early. Two more commissions followed from the same client.

  3. 2016

    The studio moves to Islands Brygge

    Eight people, one floor, and the first in-house daylight modelling workstation.

  4. 2021

    Kulturhus Nordhavn opens

    A library and community hall for 4,200 residents. It won the regional timber award and, more usefully, a queue of bookings.

  5. 2025

    Carbon budgeting becomes standard

    Every project now starts with an embodied carbon budget that the whole design team signs against.

13 Team .team Catalogue

People

The people who will draw your building

Architects, an engineer, an interior architect and a studio manager. Everybody works on site as well as in the model.

Meet the whole studio
  • Ingrid Halvorsen

    Founding partner

    Housing and civic work. Twenty-two years in practice, previously a municipal building officer.

  • Tomas Reis

    Technical director

    Structural engineer by training. Owns the carbon budget and the specification library.

  • Liora Ben-Ami

    Project architect

    Cultural and education buildings, from competition entry to final handover.

14 Values .values Catalogue

Mission and values

To build less, better, for longer

Four principles decide what we take on, what we refuse, and how a drawing changes when it meets a budget.

  • 01

    Restraint

    The best detail is usually the one you decided not to need. Every element has to earn its cost in the build and in the maintenance.

  • 02

    Evidence

    Opinions are cheap. We test daylight, overheating and cost in models and bring the numbers to the client meeting.

  • 03

    Craft

    A junction is drawn at 1:5 before the plan is finished at 1:100. If we cannot draw it, a contractor cannot build it well.

  • 04

    Stewardship

    Buildings should outlive their architects. We design for the repair, not only for the opening photograph.

15 Pricing .pricing Catalogue

Retainer options

Monthly Annual Save 15%

Switch to annual billing to save 15%.

Essential

A single house, a feasibility study or a second opinion on a site you are close to buying.

€2,400 / month

One project in progress. Minimum three months.

  • Brief workshop and site appraisal
  • Three massing options with cost bands
  • Daylight and overheating check
  • Two design revisions per stage
  • Monthly review with a project architect
Enquire

Atelier

For developers and institutions with a pipeline of sites and a long horizon.

€9,600 / month

Unlimited projects, four design reviews a month.

  • Everything in Signature
  • Unlimited projects in progress
  • Four design reviews a month with a partner
  • Model shop and physical study access
  • Priority scheduling and holiday cover
Enquire

All fees exclude VAT and statutory fees. A first conversation is always free.

16 Costs .costs Catalogue

What moves the fee

Three things decide the number

Two projects of the same size can differ by a third. These are the three variables we price first, before any drawing exists.

  • 01 — Consent

    The planning route

    A straightforward local-plan application and a heritage statement are different jobs. We price the route, not the optimism.

  • 02 — Structure

    The span and the ground

    Long spans and poor ground are paid for twice: once in the frame and once in the engineer's time. Both are measured at concept stage.

  • 03 — Detail

    The level of finish

    A bespoke stair and a standard one cost the same to draw and very different amounts to build. The fee follows the drawing hours.

17 Compare .compare Catalogue

What is included

Compare the three retainers

The table scrolls sideways on narrow screens. Every row is part of the monthly fee, not a separate invoice.

Included services by retainer tier
Included Essential Signature Atelier
Site appraisal Yes Yes Yes
Daylight and carbon modelling Basic check Full model Full model
Planning submission Not included Yes Yes
Technical drawing package Not included Yes Yes
Tender support Not included Yes Yes
Site supervision Monthly visit Weekly visit Weekly visit
Projects in parallel 1 2 Unlimited
Design reviews with a partner Quarterly Monthly Four a month
Notice period 3 months 3 months 6 months
18 FAQ .faq Catalogue

Questions

Before you get in touch

Is the first meeting really free?

Yes. A first conversation of up to ninety minutes, on site or in the studio, costs nothing and commits you to nothing. If the project is not a fit we will say so in that meeting and point you to a practice that suits it better.

Can we start with a feasibility study only?

That is what the Essential retainer is for. Many clients use three months of Essential to test a site before deciding whether to buy it, then either continue into Signature or stop with a written report they own outright.

What happens if the project pauses?

Retainers can be paused once for up to four months at no charge, which covers the usual waits around planning or financing. We hold your slot for the return date.

Do you work outside Denmark?

We work across Northern Europe and have completed projects in Sweden, Germany and the Netherlands. We ask for a local partner architect on the ground for statutory submissions, and that fee is quoted separately.

Who owns the drawings?

You do, once the final invoice for a stage is paid. We keep a licence to publish the project in our portfolio and to reuse technical details, which is standard practice and negotiable for confidential work.

How do you handle construction cost overruns?

We do not guarantee a build price, and any architect who does is guessing. We do commit to a cost report at the end of every stage, with variances explained in writing, and we re-design rather than let a tender exceed the agreed budget by more than ten percent.

19 Contact .contact Catalogue

Project enquiry

At least 20 characters. A paragraph is plenty.

20 Newsletter .newsletter Catalogue
21 Posts .posts Catalogue

Articles

22 Article .article Catalogue
Daylight

Designing for the darkest week of the year

Abstract illustration of a colonnade with a large circular opening

Every December we go back to the buildings we finished five years ago and take light readings at eleven in the morning. It is the least glamorous ritual in the studio and the one that has changed our drawings the most. Almost every problem we find was visible in the first plan, and almost none of it was visible in the photographs we published.

The reason is simple. A building is photographed in June, on a bright day, with the lights off. It is lived in during February, at four in the afternoon, with the lights on and the heating running. Those are two different buildings.

The June problem

Our clients rarely ask for a specific daylight factor. They ask for a home that feels generous, or a library where people stay longer than they planned. Both requests are really about light, and both are decided before the first interior render exists.

The June problem is that a deep plan with a large south window will look wonderful in a summer photograph. In winter, the same room will be bright for two hours and gloomy for six. The window was never the issue. The depth of the room behind it was.

A room is not lit by the window it has. It is lit by the distance between that window and the furthest thing you want to see.

Ingrid Halvorsen, founding partner

Once we started measuring that distance, most of our arguments about windows disappeared. A room seven metres deep needs light from two sides or a roof, whatever the elevation looks like.

Four measurements we always take

Before a plan is approved internally, the project architect brings four numbers to the Monday review. They are not a simulation result; the simulation comes later. They are a quick sanity check that costs twenty minutes.

  1. Room depth against ceiling height. Anything deeper than twice the ceiling height needs a second light source.
  2. Glazing ratio by room. Window area as a percentage of floor area, checked room by room rather than for the building as a whole.
  3. Orientation spread. How many rooms receive light from more than one direction.
  4. Obstruction angle. What stands opposite the window, and at what angle it blocks the winter sun.

The third number is the one that surprises clients. A flat where every room faces the same way is a flat with one mood. Two orientations give you a morning room and an evening room, and that is worth more than an extra four square metres.

The plan test

We use a simple table in every project, filled in at stage two and revisited at stage four. It is deliberately coarse. Precision at this stage is a way of avoiding decisions.

Daylight targets used at concept stage, measured on the darkest week.
Space Daylight factor Our rule
Kitchen 2.0% Glazing at least 12% of floor area
Living room 2.5% Two orientations where the site allows
Bedroom 1.5% No light borrowed from circulation
Circulation 1.0% Borrowed light acceptable
The targets are stricter than the national building regulation, which sets a single figure for the whole dwelling rather than for the rooms people actually use.

Room by room, not building by building

A dwelling can pass a whole-building average while containing one room that is effectively a cupboard with a bed in it. We stopped reporting averages in 2019. Every room is listed, every room is checked, and the one that fails gets redesigned before the plan goes to the client.

What it costs to get it wrong

Lighting a gloomy room artificially is cheap to install and expensive to live with. In a 90 square metre apartment, correcting a dark living room usually means one of three things: a larger opening, a different plan, or a light well. The first is the cheapest and the last is the most disruptive, and all three are decided in week three or not at all.

We keep a small script that converts a room's dimensions and glazing into a first-pass estimate, mostly so that the conversation starts with numbers rather than adjectives:

{
      "room": "living",
      "depth_m": 6.4,
      "ceiling_m": 2.7,
      "glazing_ratio": 0.14,
      "orientations": ["south", "west"],
      "target_df": 2.5,
      "result": "pass"
    }

The result field is intentionally blunt: pass or fail. Anything in between tends to be argued about for a week and then built anyway.

A short checklist

Rule of thumb If you need the light on at eleven in the morning in December, the window is in the wrong wall — or the room is too deep for the window it has.

Before signing off any plan, ask four questions:

  • Can I describe every room's light in one sentence without mentioning a render?
  • Does any room depend on a wall that will be built by someone else?
  • Have I tested the plan on the shortest day, not the longest?
  • If the answer is no to any of these, who is going to fix it, and when?

None of this is novel. It is the ordinary discipline of drawing a section before falling in love with a plan, and it is the cheapest design work we do. The buildings that feel calm in February are rarely the ones with the largest windows. They are the ones where somebody measured the distance from the window to the far wall and decided to move it.

Leave a comment

Comments are moderated by the studio. We publish criticism as readily as praise.

Never published.
At least 20 characters.

24 Results .results Catalogue

Results

6 articles

25 CTA band .cta Catalogue

Tell us about the site

Send a location, a rough budget and what you want the building to do. We reply within two working days with an honest view of whether we are the right studio.

Palette